Panmure Basin’s new bridge
You should know
Jubilee Bridge is currently closed. For an alternative route, refer to Auckland Transport’s Journey Planner.
Planning is under way to construct a new bridge which we expect to complete in 2025. Read more about the bridge closure on OurAuckland.
Artist's impression of the new three-metre-wide steel arch bridge crossing Panmure Basin.
Project timeline
We expect to lift the new bridge onto the site in late December 2024. The old bridge will be demolished in January 2025.
Panmure Basin walkway will remain open for most of the project.
There may be occasional brief closures. We will post signage to let you know.
Sign up for monthly local news and event updates on OurAuckland.
Jubilee Bridge, which crosses over Panmure Basin, connecting Watene Road and Lagoon Drive, is currently closed.
What the project is about
Jubilee Bridge is a 60-metre pedestrian bridge crossing Panmure Basin from Lagoon Drive.
Built in 1984, the bridge is now closed due to safety issues. Repairs and efforts to prolong the life of the bridge are no longer feasible or cost-effective.
A replacement bridge will be funded under our 10-year Budget 2021-2031.
The new three-metre-wide steel arch bridge is already designed and has resource consent.