Skip to main content

Back to Notices of requirement to designate land (NOR)

Papakura to Bombay (P2B) Project Stage 2: Drury South Interchange Connections (NoR 5) NZ Transport Agency Waka Kotahi (NZTA)

Closed for submissions

About the notice of requirement

​Notice of requirement lodged by NZTA for the designation for a new state highway to be constructed at the proposed Drury South Interchange and provide direct transport connections between State Highway 1 (SH1) and Quarry Road (to the east) and Great South Road (to the west). This includes a new overpass across State Highway 1 at Drury South Interchange, and associated infrastructure (NoR 5).

The Papakura to Bombay (P2B) Project Stage 2 includes five (5) Notices of Requirement. The purpose the P2B Project Stage 2 is to provide upgrades to SH1 between Drury South and Bombay, improving accessibility for all road users (including active modes), and support regional growth through the improvement of safety, functionality, and resilience of the existing transport corridor.


Status

​Lodged on 19 February 2024

Notified on 14 June 2024

Submissions closed: 15 July 2024

Hearings – For more information, see the Hearing Documents


Notice of requirement documents

Notification documents

Section 92 - Request for further information

By email


By post